Traffic

  • CONSTRUCTION: Union Bridge, NB MD-75 (Green Valley Rd)

    Between Clemsonville Rd and Houck Rd - Construction - NB lanes blocked

    07/20/2015 04:31:30 AM

  • CONSTRUCTION: Rock Creek, 27th St NW

    Between Broad Branch Rd NW and Military Rd NW - Construction - blocked in both directions for bridge work until September 15. Local Access only

    07/20/2015 06:15:04 AM

  • ROAD_HAZARD_WATER_MAIN_BREAK: Bethesda, MD-191 (Bradly Blvd) Closed in Both Directions

    Between Bradmoor Dr and Huntington Parkway - Water Main Break - Alternate Routes- Old Georgetown Rd or River rd Please follow the posted Detour Signs. (this work zone is expected to remain in place thru late Hours of July 28, 2015 and possibly open by Mid-night "weather Permitting".

    07/28/2015 06:35:28 PM

  • CONSTRUCTION: Lorton, Route 642 (Lorton Rd)

    Between Apple Orchard Rd and Furnace Rd - Construction - scheduled to be blocked 9:30am until 3:30pm until August 14th

    07/06/2015 05:15:41 AM

  • CONSTRUCTION: Damascus, Sweepstakes Rd

    Between MD-124 (Woodfield Rd) and MD-27 (Ridge Rd) - Construction - scheduled to be closed Friday, July 10 until December 10, Follow posted detour signs.

    07/09/2015 03:57:15 AM

  • CONSTRUCTION: Mall, EB Independence Ave SW

    At Kutz Bridge - Construction - 2 lanes will be open from 9am until 7pm. From 7pm until 6am traffic will be reduced to 1 lane. No lanes will be blocked for morning rush hours. Traffic only moves EB on the bridge. Work is expected to be completed in Fall, 2015

    06/09/2015 08:49:57 AM

  • MASS_TRANSIT_MASS_TRANSIT: Fairfax, Inova Fairfax Hospital Metro Construction

    At Routes 401, 402 - Mass Transit - Due to construction project, buses will operate on detour during two phases of Woodburn access road reconstruction between Woodburn Road and Wellness Boulevard. Total construction will last approximately 9 weeks.

    06/16/2015 04:09:24 AM

  • MASS_TRANSIT_MASS_TRANSIT: Pentagon, Transit Center

    At Fairfax Connector - Mass Transit - Due to construction at Pentagon Transit Center, These Fairfax Connector Routes will be affected : Routes 306, 393, 394, 395, 599. Buses will operate on detour via North and South Rotary Road when exiting the Pentagon Transit Center to accommodate bus lane repairs and pedestrian access, safety, and security improvements. Buses will continue to board passengers at bays L4 (Route 306) and L7 (Routes 393, 394, 395, 599). Traffic control officers will be in place during weekday rush hours. Construction is anticipated to last through mid-August 2015.

    06/16/2015 04:00:41 AM

  • PLANNED_EVENT: Leesburg, Loudoun County Fairgrounds

    At Dry Mill Rd - Event - Loudoun County Fair 2015 from July 27-August 1 - near the intersections of Rtes 7 and 9

    07/26/2015 06:28:30 AM

  • ACCIDENT: Alexandria, Little River Tpke

    Near I-395/Henry G Shirley Memorial Hwy - Road closed due to accident.

    07/28/2015 08:06:24 PM

  • CONSTRUCTION: Washington, Massachusetts Ave NW

    Between 2nd St NW and H St NW/3rd St NW - Construction work. intermittent lane blockages

    07/28/2015 07:01:31 AM

  • CONSTRUCTION: Annapolis, Bladen St

    Near MD-450/College Ave/Church Cir - Roadwork. blocking all lanes. Two-way traffic in the northbound lanes until 5 am

    07/28/2015 08:13:37 PM

  • CONSTRUCTION: Washington, H St NW

    Between Massachusetts Ave NW/3rd St NW and 2nd St NW - Construction work. intermittent lane blockages

    07/28/2015 07:01:31 AM

  • CONSTRUCTION: Fairfax, Dulles Airport Access Rd

    Between Reston Pkwy and Fairfax County Pkwy - Roadwork. blocking the left lane until 5 am

    07/28/2015 07:01:07 PM

  • CONSTRUCTION: Fairfax, Dulles Airport Access Rd

    Near Centreville Rd (#10) - Roadwork. blocking the left lane until 5 am

    07/28/2015 07:01:07 PM

  • ACCIDENT: Alexandria, Little River Tpke

    Near Old Columbia Pike/Columbia Rd - Road closed due to accident.

    07/28/2015 08:03:54 PM

  • CONSTRUCTION: Arlington, GW Parkway - NB

    Between Ronald Reagan National Airport and I-395/14th St Brg - Construction - traffic gets by using alternate lanes - scheduled 9:30am until 3:30pm with 1 lane blocked and 2 lanes blocked 7pm until 5:30am

    06/15/2015 05:34:32 AM

  • CONSTRUCTION: Washington, H St NW

    Between 2nd St NW and Massachusetts Ave NW/3rd St NW - Construction work. intermittent lane blockages

    07/28/2015 07:01:31 AM

  • CONSTRUCTION: Washington DC Metro Area, GW Parkway - SB

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: Anne Arundel, Solomons Island Rd

    Between MD-258/Bay Front Rd E and MD-260/Chesapeake Beach Rd - Roadwork. blocking all lanes. Two-way traffic in the southbound lanes until 5 am

    07/28/2015 08:12:11 PM

  • CONSTRUCTION: Loudoun, Dulles Airport Access Rd

    Near RT-28 (#9) - Roadwork in the emergency lane. Roadwork. blocking the left lane until 5 am

    07/28/2015 06:02:39 PM

  • CONSTRUCTION: Fairfax, I-95 (VA) - SB

    Between Franconia-Springfield Pkwy and Fairfax Co. Pkwy (#166A) - Construction - left lane blocked - scheduled Monday - Friday 9pm until 5am

    07/28/2015 03:49:21 AM

  • CONSTRUCTION: Arlington, I-66 - WB

    Between Westmoreland St (#68) and RT-7 Leesburg Pk (#66) - Construction - traffic gets by using alternate lanes - scheduled 10pm until 5am until August 1st

    07/28/2015 03:52:24 AM

  • CONSTRUCTION: I-66

    Between Westmoreland St (#68) and RT-7 Leesburg Pk (#66) - Construction - traffic gets by using alternate lanes - scheduled 10pm until 5am until August 1st

    07/28/2015 03:52:24 AM

  • CONSTRUCTION: I-66

    Between Westmoreland St (#68) and RT-7 Leesburg Pk (#66) - Construction - traffic gets by using alternate lanes - scheduled 10pm until 5am until August 1st

    07/28/2015 03:52:24 AM

  • CONSTRUCTION: I-66

    Between Westmoreland St (#68) and RT-7 Leesburg Pk (#66) - Construction - traffic gets by using alternate lanes - scheduled 10pm until 5am until August 1st

    07/28/2015 03:52:24 AM

  • CONSTRUCTION: I-66

    Between Westmoreland St (#68) and RT-7 Leesburg Pk (#66) - Construction - traffic gets by using alternate lanes - scheduled 10pm until 5am until August 1st

    07/28/2015 03:52:24 AM

  • CONSTRUCTION: I-66

    Between Westmoreland St (#68) and RT-7 Leesburg Pk (#66) - Construction - traffic gets by using alternate lanes - scheduled 10pm until 5am until August 1st

    07/28/2015 03:52:24 AM

  • CONSTRUCTION: I-66

    Between Westmoreland St (#68) and RT-7 Leesburg Pk (#66) - Construction - traffic gets by using alternate lanes - scheduled 10pm until 5am until August 1st

    07/28/2015 03:52:24 AM

  • CONSTRUCTION: I-66

    Between Westmoreland St (#68) and RT-7 Leesburg Pk (#66) - Construction - traffic gets by using alternate lanes - scheduled 10pm until 5am until August 1st

    07/28/2015 03:52:24 AM

  • CONSTRUCTION: I-66

    Between Westmoreland St (#68) and RT-7 Leesburg Pk (#66) - Construction - traffic gets by using alternate lanes - scheduled 10pm until 5am until August 1st

    07/28/2015 03:52:24 AM

  • CONSTRUCTION: I-66

    Between Westmoreland St (#68) and RT-7 Leesburg Pk (#66) - Construction - traffic gets by using alternate lanes - scheduled 10pm until 5am until August 1st

    07/28/2015 03:52:24 AM

  • CONSTRUCTION: I-66

    Between Westmoreland St (#68) and RT-7 Leesburg Pk (#66) - Construction - traffic gets by using alternate lanes - scheduled 10pm until 5am until August 1st

    07/28/2015 03:52:24 AM

  • CONSTRUCTION: I-66

    Between Westmoreland St (#68) and RT-7 Leesburg Pk (#66) - Construction - traffic gets by using alternate lanes - scheduled 10pm until 5am until August 1st

    07/28/2015 03:52:24 AM

  • CONSTRUCTION: I-66

    Between Westmoreland St (#68) and RT-7 Leesburg Pk (#66) - Construction - traffic gets by using alternate lanes - scheduled 10pm until 5am until August 1st

    07/28/2015 03:52:24 AM

  • CONSTRUCTION: I-66

    Between Westmoreland St (#68) and RT-7 Leesburg Pk (#66) - Construction - traffic gets by using alternate lanes - scheduled 10pm until 5am until August 1st

    07/28/2015 03:52:24 AM

  • CONSTRUCTION: I-66

    Between Westmoreland St (#68) and RT-7 Leesburg Pk (#66) - Construction - traffic gets by using alternate lanes - scheduled 10pm until 5am until August 1st

    07/28/2015 03:52:24 AM

  • CONSTRUCTION: I-66

    Between Westmoreland St (#68) and RT-7 Leesburg Pk (#66) - Construction - traffic gets by using alternate lanes - scheduled 10pm until 5am until August 1st

    07/28/2015 03:52:24 AM

  • CONSTRUCTION: I-66

    Between Westmoreland St (#68) and RT-7 Leesburg Pk (#66) - Construction - traffic gets by using alternate lanes - scheduled 10pm until 5am until August 1st

    07/28/2015 03:52:24 AM

  • CONSTRUCTION: I-66

    Between Westmoreland St (#68) and RT-7 Leesburg Pk (#66) - Construction - traffic gets by using alternate lanes - scheduled 10pm until 5am until August 1st

    07/28/2015 03:52:24 AM

  • CONSTRUCTION: I-66

    Between Westmoreland St (#68) and RT-7 Leesburg Pk (#66) - Construction - traffic gets by using alternate lanes - scheduled 10pm until 5am until August 1st

    07/28/2015 03:52:24 AM

  • CONSTRUCTION: I-66

    Between Westmoreland St (#68) and RT-7 Leesburg Pk (#66) - Construction - traffic gets by using alternate lanes - scheduled 10pm until 5am until August 1st

    07/28/2015 03:52:24 AM

  • CONSTRUCTION: I-66

    Between Westmoreland St (#68) and RT-7 Leesburg Pk (#66) - Construction - traffic gets by using alternate lanes - scheduled 10pm until 5am until August 1st

    07/28/2015 03:52:24 AM

  • CONSTRUCTION: I-95 (VA)

    Between Franconia-Springfield Pkwy and Fairfax Co. Pkwy (#166A) - Construction - left lane blocked - scheduled Monday - Friday 9pm until 5am

    07/28/2015 03:49:21 AM

  • CONSTRUCTION: I-95 (VA)

    Between Franconia-Springfield Pkwy and Fairfax Co. Pkwy (#166A) - Construction - left lane blocked - scheduled Monday - Friday 9pm until 5am

    07/28/2015 03:49:21 AM

  • CONSTRUCTION: I-95 (VA)

    Between Franconia-Springfield Pkwy and Fairfax Co. Pkwy (#166A) - Construction - left lane blocked - scheduled Monday - Friday 9pm until 5am

    07/28/2015 03:49:21 AM

  • CONSTRUCTION: I-95 (VA)

    Between Franconia-Springfield Pkwy and Fairfax Co. Pkwy (#166A) - Construction - left lane blocked - scheduled Monday - Friday 9pm until 5am

    07/28/2015 03:49:21 AM

  • CONSTRUCTION: I-95 (VA)

    Between Franconia-Springfield Pkwy and Fairfax Co. Pkwy (#166A) - Construction - left lane blocked - scheduled Monday - Friday 9pm until 5am

    07/28/2015 03:49:21 AM

  • CONSTRUCTION: I-95 (VA)

    Between Franconia-Springfield Pkwy and Fairfax Co. Pkwy (#166A) - Construction - left lane blocked - scheduled Monday - Friday 9pm until 5am

    07/28/2015 03:49:21 AM

  • CONSTRUCTION: I-95 (VA)

    Between Franconia-Springfield Pkwy and Fairfax Co. Pkwy (#166A) - Construction - left lane blocked - scheduled Monday - Friday 9pm until 5am

    07/28/2015 03:49:21 AM

  • CONSTRUCTION: I-95 (VA)

    Between Franconia-Springfield Pkwy and Fairfax Co. Pkwy (#166A) - Construction - left lane blocked - scheduled Monday - Friday 9pm until 5am

    07/28/2015 03:49:21 AM

  • CONSTRUCTION: I-95 (VA)

    Between Franconia-Springfield Pkwy and Fairfax Co. Pkwy (#166A) - Construction - left lane blocked - scheduled Monday - Friday 9pm until 5am

    07/28/2015 03:49:21 AM

  • CONSTRUCTION: I-95 (VA)

    Between Franconia-Springfield Pkwy and Fairfax Co. Pkwy (#166A) - Construction - left lane blocked - scheduled Monday - Friday 9pm until 5am

    07/28/2015 03:49:21 AM

  • CONSTRUCTION: I-95 (VA)

    Between Franconia-Springfield Pkwy and Fairfax Co. Pkwy (#166A) - Construction - left lane blocked - scheduled Monday - Friday 9pm until 5am

    07/28/2015 03:49:21 AM

  • CONSTRUCTION: I-95 (VA)

    Between Franconia-Springfield Pkwy and Fairfax Co. Pkwy (#166A) - Construction - left lane blocked - scheduled Monday - Friday 9pm until 5am

    07/28/2015 03:49:21 AM

  • CONSTRUCTION: I-95 (VA)

    Between Franconia-Springfield Pkwy and Fairfax Co. Pkwy (#166A) - Construction - left lane blocked - scheduled Monday - Friday 9pm until 5am

    07/28/2015 03:49:21 AM

  • CONSTRUCTION: I-95 (VA)

    Between Franconia-Springfield Pkwy and Fairfax Co. Pkwy (#166A) - Construction - left lane blocked - scheduled Monday - Friday 9pm until 5am

    07/28/2015 03:49:21 AM

  • CONSTRUCTION: I-95 (VA)

    Between Franconia-Springfield Pkwy and Fairfax Co. Pkwy (#166A) - Construction - left lane blocked - scheduled Monday - Friday 9pm until 5am

    07/28/2015 03:49:21 AM

  • CONSTRUCTION: I-95 (VA)

    Between Franconia-Springfield Pkwy and Fairfax Co. Pkwy (#166A) - Construction - left lane blocked - scheduled Monday - Friday 9pm until 5am

    07/28/2015 03:49:21 AM

  • CONSTRUCTION: GW Parkway

    Between Ronald Reagan National Airport and I-395/14th St Brg - Construction - traffic gets by using alternate lanes - scheduled 9:30am until 3:30pm with 1 lane blocked and 2 lanes blocked 7pm until 5:30am

    06/15/2015 05:34:32 AM

  • CONSTRUCTION: GW Parkway

    Between Ronald Reagan National Airport and I-395/14th St Brg - Construction - traffic gets by using alternate lanes - scheduled 9:30am until 3:30pm with 1 lane blocked and 2 lanes blocked 7pm until 5:30am

    06/15/2015 05:34:32 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between Ronald Reagan National Airport and I-395/14th St Brg - Construction - traffic gets by using alternate lanes - scheduled 9:30am until 3:30pm with 1 lane blocked and 2 lanes blocked 7pm until 5:30am

    06/15/2015 05:34:32 AM

  • CONSTRUCTION: GW Parkway

    Between Ronald Reagan National Airport and I-395/14th St Brg - Construction - traffic gets by using alternate lanes - scheduled 9:30am until 3:30pm with 1 lane blocked and 2 lanes blocked 7pm until 5:30am

    06/15/2015 05:34:32 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

Meet Melissa