Traffic

  • CONSTRUCTION: Union Bridge, NB MD-75 (Green Valley Rd)

    Between Clemsonville Rd and Houck Rd - Construction - NB lanes blocked

    07/06/2015 04:42:10 AM

  • CONSTRUCTION: Frederick, NB MD-85 (Buckeystown PIke)

    Between I-270 and Spectrum Dr - Construction - right turn lane and shoulder blocked

    07/06/2015 04:55:38 AM

  • CONSTRUCTION: Lorton, Route 642 (Lorton Rd)

    Between Apple Orchard Rd and Furnace Rd - Construction - scheduled to be blocked 9:30am until 3:30pm until August 14th

    07/06/2015 05:15:41 AM

  • CONSTRUCTION: Mall, EB Independence Ave SW

    At Kutz Bridge - Construction - 2 lanes will be open from 9am until 7pm. From 7pm until 6am traffic will be reduced to 1 lane. No lanes will be blocked for morning rush hours. Traffic only moves EB on the bridge. Work is expected to be completed in Fall, 2015

    06/09/2015 08:49:57 AM

  • CONSTRUCTION_UTILITY_WORK: Mt Vernon Square, Massachusetts Ave NW and H Street

    Between 3rd St NW and 4th St NW - Utility Work - all lanes blocked, detour posted, seek alternate - Every Saturday and Sunday in June and July these roads will be closed from 8:00 AM until 6:00 PM. Detour signs will direct motorists around the work zones to use H, I, K and 5th streets.

    05/30/2015 06:43:28 AM

  • MASS_TRANSIT_MASS_TRANSIT: Fairfax, Inova Fairfax Hospital Metro Construction

    At Routes 401, 402 - Mass Transit - Due to construction project, buses will operate on detour during two phases of Woodburn access road reconstruction between Woodburn Road and Wellness Boulevard. Total construction will last approximately 9 weeks.

    06/16/2015 04:09:24 AM

  • CONSTRUCTION: Haymarket, Jefferson St

    Between Walter Robinson Ln and Cheyenne Way - Closed due to roadwork.

    06/25/2015 04:09:43 PM

  • MASS_TRANSIT_MASS_TRANSIT: Pentagon, Transit Center

    At Fairfax Connector - Mass Transit - Due to construction at Pentagon Transit Center, These Fairfax Connector Routes will be affected : Routes 306, 393, 394, 395, 599. Buses will operate on detour via North and South Rotary Road when exiting the Pentagon Transit Center to accommodate bus lane repairs and pedestrian access, safety, and security improvements. Buses will continue to board passengers at bays L4 (Route 306) and L7 (Routes 393, 394, 395, 599). Traffic control officers will be in place during weekday rush hours. Construction is anticipated to last through mid-August 2015.

    06/16/2015 04:00:41 AM

  • CONSTRUCTION: Washington DC Metro Area, Aden Rd

    Between Colvin Ln and Marsteller Dr - Closed due to roadwork. bridge reconstruction

    06/25/2015 04:09:43 PM

  • CONSTRUCTION: Washington DC Metro Area, Aden Rd

    Between Marsteller Dr and Colvin Ln - Closed due to roadwork. bridge reconstruction

    06/25/2015 04:09:43 PM

  • MASS_TRANSIT_MASS_TRANSIT: WMATA, Metrorail Information

    At Orange Line - Mass Transit - Single tracking through West Falls due to person struck by a train outside of W Falls Church. Service Changes: New Carrollton-W Falls Church. Shuttle WFC -Vienna. Transfer cross platform at WFC. Allow additional time. Expect delays in both directions on both Orange and Silver Lines. Bus Alternatives: 3T to McLean, 28A to King St, 28X

    07/06/2015 06:08:02 AM

  • CONSTRUCTION_UTILITY_WORK: Navy Yard, EB Virginia Ave

    Between 5th St SE and 7th St SE - Utility Work - scheduled to be closed 9:30am until 3:30pm until July 15th. In this section of Virginia Ave, traffic only moves EB

    06/24/2015 05:06:55 AM

  • CONSTRUCTION: Arlington, GW Parkway - NB

    Between Ronald Reagan National Airport and I-395/14th St Brg - Construction - traffic gets by using alternate lanes - scheduled 9:30am until 3:30pm with 1 lane blocked and 2 lanes blocked 7pm until 5:30am

    06/15/2015 05:34:32 AM

  • CONSTRUCTION: Washington DC Metro Area, GW Parkway - SB

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • ACCIDENT: Montgomery, I-270 - SB

    At Montrose Rd - Accident - 2 right lanes blocked

    07/06/2015 07:24:36 AM

  • ROAD_HAZARD_DEBRIS: Gaithersburg, I-270 - SB

    Off ramp to RT-124 (#11) - Debris on Road - right lane blocked

    07/06/2015 06:25:58 AM

  • DISABLED_VEHICLE: Prince George's, Beltway - Outer Loop

    Approaching RT-1/College Park (#25) - Disabled Vehicle

    07/06/2015 06:59:58 AM

  • DISABLED_VEHICLE: Montgomery, Beltway - Inner Loop

    After RT-185 Connecticut Av (#33) - Disabled Vehicle

    07/06/2015 07:06:12 AM

  • ACCIDENT: Laurel, Baltimore Washington Pkwy - NB

    At RT-198/Laurel-Ft. Meade Rd - Accident - car vs woods

    07/06/2015 06:48:17 AM

  • ACCIDENT: Alexandria, I-395 - NB

    On ramp from Duke St/Little River Tpk (#3) - Accident

    07/06/2015 07:12:47 AM

  • CONSTRUCTION: Washington, Virginia Ave NW

    Between Rock Creek and Potomac Pky NW and E St NW - Construction work. Traffic gets through in one lane.

    06/25/2015 04:09:43 PM

  • ACCIDENT: Baltimore Washington Pkwy

    At RT-198/Laurel-Ft. Meade Rd - Accident - car vs woods

    07/06/2015 06:48:17 AM

  • ACCIDENT: Baltimore Washington Pkwy

    At RT-198/Laurel-Ft. Meade Rd - Accident - car vs woods

    07/06/2015 06:48:17 AM

  • ACCIDENT: Baltimore Washington Pkwy

    At RT-198/Laurel-Ft. Meade Rd - Accident - car vs woods

    07/06/2015 06:48:17 AM

  • ACCIDENT: Baltimore Washington Pkwy

    At RT-198/Laurel-Ft. Meade Rd - Accident - car vs woods

    07/06/2015 06:48:17 AM

  • ROAD_HAZARD_DEBRIS: I-270

    Off ramp to RT-124 (#11) - Debris on Road - right lane blocked

    07/06/2015 06:25:58 AM

  • ROAD_HAZARD_DEBRIS: I-270

    Off ramp to RT-124 (#11) - Debris on Road - right lane blocked

    07/06/2015 06:25:58 AM

  • ACCIDENT: I-270

    At Montrose Rd - Accident - 2 right lanes blocked

    07/06/2015 07:24:36 AM

  • ACCIDENT: I-270

    At Montrose Rd - Accident - 2 right lanes blocked

    07/06/2015 07:24:36 AM

  • ACCIDENT: I-270

    At Montrose Rd - Accident - 2 right lanes blocked

    07/06/2015 07:24:36 AM

  • ACCIDENT: I-270

    At Montrose Rd - Accident - 2 right lanes blocked

    07/06/2015 07:24:36 AM

  • ROAD_HAZARD_DEBRIS: I-270

    Off ramp to RT-124 (#11) - Debris on Road - right lane blocked

    07/06/2015 06:25:58 AM

  • ROAD_HAZARD_DEBRIS: I-270

    Off ramp to RT-124 (#11) - Debris on Road - right lane blocked

    07/06/2015 06:25:58 AM

  • CONSTRUCTION: GW Parkway

    Between Ronald Reagan National Airport and I-395/14th St Brg - Construction - traffic gets by using alternate lanes - scheduled 9:30am until 3:30pm with 1 lane blocked and 2 lanes blocked 7pm until 5:30am

    06/15/2015 05:34:32 AM

  • CONSTRUCTION: GW Parkway

    Between Ronald Reagan National Airport and I-395/14th St Brg - Construction - traffic gets by using alternate lanes - scheduled 9:30am until 3:30pm with 1 lane blocked and 2 lanes blocked 7pm until 5:30am

    06/15/2015 05:34:32 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between Ronald Reagan National Airport and I-395/14th St Brg - Construction - traffic gets by using alternate lanes - scheduled 9:30am until 3:30pm with 1 lane blocked and 2 lanes blocked 7pm until 5:30am

    06/15/2015 05:34:32 AM

  • CONSTRUCTION: GW Parkway

    Between Ronald Reagan National Airport and I-395/14th St Brg - Construction - traffic gets by using alternate lanes - scheduled 9:30am until 3:30pm with 1 lane blocked and 2 lanes blocked 7pm until 5:30am

    06/15/2015 05:34:32 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • CONSTRUCTION: GW Parkway

    Between I-495 Capital Beltway and Ronald Reagan National Airport - Construction - 1 lane blocked 9:30am until 3:30pm 2 lanes blocked 7pm until 5:30am

    06/15/2015 10:29:27 AM

  • DISABLED_VEHICLE: Beltway

    After RT-185 Connecticut Av (#33) - Disabled Vehicle

    07/06/2015 07:06:12 AM

  • DISABLED_VEHICLE: Beltway

    After RT-185 Connecticut Av (#33) - Disabled Vehicle

    07/06/2015 07:06:12 AM

  • DISABLED_VEHICLE: Beltway

    Approaching RT-1/College Park (#25) - Disabled Vehicle

    07/06/2015 06:59:58 AM

  • DISABLED_VEHICLE: Beltway

    Approaching RT-1/College Park (#25) - Disabled Vehicle

    07/06/2015 06:59:58 AM

  • DISABLED_VEHICLE: Beltway

    After RT-185 Connecticut Av (#33) - Disabled Vehicle

    07/06/2015 07:06:12 AM

  • DISABLED_VEHICLE: Beltway

    After RT-185 Connecticut Av (#33) - Disabled Vehicle

    07/06/2015 07:06:12 AM

  • DISABLED_VEHICLE: Beltway

    Approaching RT-1/College Park (#25) - Disabled Vehicle

    07/06/2015 06:59:58 AM

  • DISABLED_VEHICLE: Beltway

    Approaching RT-1/College Park (#25) - Disabled Vehicle

    07/06/2015 06:59:58 AM

  • DISABLED_VEHICLE: Beltway

    After RT-185 Connecticut Av (#33) - Disabled Vehicle

    07/06/2015 07:06:12 AM

  • DISABLED_VEHICLE: Beltway

    After RT-185 Connecticut Av (#33) - Disabled Vehicle

    07/06/2015 07:06:12 AM

  • DISABLED_VEHICLE: Beltway

    Approaching RT-1/College Park (#25) - Disabled Vehicle

    07/06/2015 06:59:58 AM

  • DISABLED_VEHICLE: Beltway

    Approaching RT-1/College Park (#25) - Disabled Vehicle

    07/06/2015 06:59:58 AM

  • DISABLED_VEHICLE: Beltway

    After RT-185 Connecticut Av (#33) - Disabled Vehicle

    07/06/2015 07:06:12 AM

  • DISABLED_VEHICLE: Beltway

    After RT-185 Connecticut Av (#33) - Disabled Vehicle

    07/06/2015 07:06:12 AM

  • DISABLED_VEHICLE: Beltway

    After RT-185 Connecticut Av (#33) - Disabled Vehicle

    07/06/2015 07:06:12 AM

  • DISABLED_VEHICLE: Beltway

    After RT-185 Connecticut Av (#33) - Disabled Vehicle

    07/06/2015 07:06:12 AM

  • DISABLED_VEHICLE: Beltway

    Approaching RT-1/College Park (#25) - Disabled Vehicle

    07/06/2015 06:59:58 AM

  • DISABLED_VEHICLE: Beltway

    Approaching RT-1/College Park (#25) - Disabled Vehicle

    07/06/2015 06:59:58 AM

  • DISABLED_VEHICLE: Beltway

    After RT-185 Connecticut Av (#33) - Disabled Vehicle

    07/06/2015 07:06:12 AM

  • DISABLED_VEHICLE: Beltway

    After RT-185 Connecticut Av (#33) - Disabled Vehicle

    07/06/2015 07:06:12 AM

  • ACCIDENT: I-395

    On ramp from Duke St/Little River Tpk (#3) - Accident

    07/06/2015 07:12:47 AM

  • ACCIDENT: I-395

    On ramp from Duke St/Little River Tpk (#3) - Accident

    07/06/2015 07:12:47 AM

Meet Melissa